The City of Pittsburg's 5-Year Capital Improvement Program is a multi-year plan for the construction of new and expansion, rehabilitation, or replacement of existing City owned assets. The 5-Year CIP is used as a guide to prioritize infrastructure projects. The Program is updated annually.

The 5-Year Capital Improvement Program for Fiscal Year 2023/24 through 2027/28 includes various projects for the benefit of Pittsburg's citizens. Each of the projects meets some or all of the following criteria: 

  • Elimination of potentially hazardous or unsafe conditions and potential liabilities 
  • Replacement of high maintenance and inefficient/ineffective infrastructure 
  • Improvement to and/or creation of new services to the public 
  • Outside agency regulatory requirements and mandates 
  • Stimulation of the local economy/eliminate blighted conditions 
  • Compliance with the City of Pittsburg General Plan 
  • Preservation of existing assets

The schedule for Capital Improvement Projects is based on available funding, public benefit, and funding restrictions. Click below to view the entire current DRAFT Five Year CIP for Fiscal Year 2023/24 through 2027/28. Previous year drafts will also be listed below. Please note: Not all projects currently have funding available for design or construction.

 

Adopted FY 23-24 Capital Improvement Program

Adopted FY 22-23 Capital Improvement Program

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer